Masgcor

h

CASE STUDY

Customer: Masgcor
Locations: Addo
Coega
Montague
Packing Facility
Stellenbosch Packing Facility
Year: 2020 – 2021
Boiler equipment: Unical Modal Boiler range 140, 163, 186, 291
Burner equipment: Riello models F20, RL34, GS20
Fuel: Light Oil & LPG

SCOPE OF WORK

Masgcor required hot water boiler for washing Citrus fruit by their fruit packaging machines. From there the fruit is transferred by conveyor belt to be dried through tunnels filled with hot air, ready to be boxed and distributed.

Combustion Technology supplied the hot water boilers to generate heat for the water used in the washing bay.
Riello burners were installed to provide heat for drying.

 

MAIN OBJECTIVE

To get the desired water temperature in the washing bay to clean fruit in the packaging process and to maintain the temperature in the washing and drying applications to OEM specifications.

 

 

INSTALLATION DETAILS

  • Unical Modal Hot water boilers were installed for the supply of hot water through a closed loop system to heat up the water in the washing bay. The heat transfer was made possible through a coil that was installed in the washing bay.
  • Riello burners were installed to heat up the tunnels used for drying the fruit.

Masgcor,
Addo